A DIVISION OF CADILLAC CONSULTING INC.
5900 BALCONES DRIVE, SUITE 100, AUSTIN, TX 78731
Real Time Optimization Solutions
PERFORMANCE AND OPTIMIZATION
By implementing wholistic learning methods it reduces variation in decision making and reduces performance gaps across the drilling program
By capturing the best performing aspects of each section of the well across the rig fleet, the RTOC has the ability to optimize quickly and efficiently while reducing costs to drilling program improvement
The RTOC provides the necessary foundation for future deployment of automation systems, decreasing labour on-site and direct support from the RTOC all while maintaining the operator’s objectives
![Onshore land rig in oil and gas industry](https://static.wixstatic.com/media/b3c1fb_d452b4d1fb174d449534c9c71be90539~mv2.jpg/v1/fill/w_460,h_820,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/Onshore%20land%20rig%20in%20oil%20and%20gas%20industry.jpg)
THE RTOC GROUP PERFORMANCE
Outstanding Results - 2019 Results
Average % in Target Window: 96.96%
![Oil field, Onshore drilling rig around w](https://static.wixstatic.com/media/b3c1fb_533001727b4c43c39692ab525384b6fd~mv2.jpg/v1/fill/w_75,h_50,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/b3c1fb_533001727b4c43c39692ab525384b6fd~mv2.jpg)
![Touchscreen Computer](https://static.wixstatic.com/media/44a8b5374d1c4364a684efdb64db7728.jpg/v1/fill/w_75,h_50,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/44a8b5374d1c4364a684efdb64db7728.jpg)
![Image by WORKSITE Ltd.](https://static.wixstatic.com/media/nsplsh_377379494f786c4c706641~mv2_d_3000_2000_s_2.jpg/v1/fill/w_75,h_50,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/nsplsh_377379494f786c4c706641~mv2_d_3000_2000_s_2.jpg)
TOTAL FOOTAGE DRILLED
887,687m (2.9mil ft)
TOTAL PRODUCTION DRILLED
367,295m (1.2mil ft)
TOTAL DRILLED WITH RSS
151,746m (497,805 ft)
THE RTOC GROUP KPI AND TREND ANALYSIS
Problem Solving Made Easy
With the RTOC Group's extensive technical specification databases and data capturing techniques, relevant KPIs can easily be tracked. Trends can quickly be identified across fleet and mitigated, which can significantly shorten the learning curve and cycle time.
![Graphs](https://static.wixstatic.com/media/da9d83ef63014589acac69d0c0f44f45.jpg/v1/fill/w_129,h_86,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/da9d83ef63014589acac69d0c0f44f45.jpg)